HIGH COAL INJECTION INTO THE BLAST-FURNACE UNDER HIGH PRODUCTIVITY

Citation
Ns. Hur et al., HIGH COAL INJECTION INTO THE BLAST-FURNACE UNDER HIGH PRODUCTIVITY, Revue de métallurgie, 93(3), 1996, pp. 367-377
Citations number
4
Categorie Soggetti
Metallurgy & Metallurigical Engineering
Journal title
Revue de métallurgie
ISSN journal
00351563 → ACNP
Volume
93
Issue
3
Year of publication
1996
Pages
367 - 377
Database
ISI
SICI code
Abstract
Posco Kwangyang No. 4 furnace is currently operated with a PCI rate of 150 kg/tHM, at the high production level of 270 t/m(3).d. This perfor mance has been achieved thanks to an optimization of the operating con ditions, a control of burden distribution and an expert system guided operation.