Wt. Chan et al., CONSTRUCTION RESOURCE SCHEDULING WITH GENETIC ALGORITHMS, Journal of construction engineering and management, 122(2), 1996, pp. 125-132
Citations number
19
Categorie Soggetti
Construcion & Building Technology","Engineering, Civil","Engineering, Industrial
A new approach for resource scheduling using genetic algorithms (GAs)
is presented here. The methodology does not depend on any set of heuri
stic rules. Instead, its strength lies in the selection and recombinat
ion tasks of the GA to learn the domain of the specific project networ
k. By this it is able to evolve improved schedules with respect to the
objective function. Further, the model is general enough to encompass
both resource leveling and limited resource allocation problems unlik
e existing methods, which are class-dependent. In this paper, the desi
gn and mechanisms of the model are described. Case studies with standa
rd test problems are presented to demonstrate the performance of the G
A-scheduler when compared against heuristic methods under various reso
urce availability profiles. Results obtained with the proposed model d
o not indicate an exponential growth in the computational time require
d for larger problems.