AN IMPROVED BOUNDING-BASED METHOD FOR MULTIAREA PROBABILISTIC PRODUCTION COSTING

Citation
Bf. Hobbs et al., AN IMPROVED BOUNDING-BASED METHOD FOR MULTIAREA PROBABILISTIC PRODUCTION COSTING, IEEE transactions on power systems, 11(2), 1996, pp. 1024-1030
Citations number
15
Categorie Soggetti
Engineering, Eletrical & Electronic
ISSN journal
08858950
Volume
11
Issue
2
Year of publication
1996
Pages
1024 - 1030
Database
ISI
SICI code
0885-8950(1996)11:2<1024:AIBMFM>2.0.ZU;2-T
Abstract
This paper presents an improved bounding-based procedure for estimatin g expected production costs for a multiarea power system. The method b uilds upon the approach in [1]. It uses a state space characterization of equipment outages and loads, combined with linear optimization met hods, standard load duration curve-based production costing techniques , and clustering analysis. The method defines upper and fewer bounds t o the true expected cost, and tightens those bounds by partitioning th e outage and load spaces. Methods for constructing outage and load par titions are compared and applied to large multiarea systems. Applicati on issues, such as marginal cost estimation and the effect of transmis sion outages, are also addressed.