Jh. Murray et al., CIVIL ENGINEERING DESIGN AND CONSTRUCTION OF YUEYANG POWER-STATION, CHINA, Proceedings of the Institution of Civil Engineers. Water, maritime and energy, 118(2), 1996, pp. 121-130
Between August 1986 and December 1990 Mouchel was the civil engineerin
g consultant on the 2 x 362 MW coal-fixed Yueyang power station constr
ucted by the Huaneng International Power Development Corporation and m
ain plant supplier GEC Alsthom Power Plants Ltd in the heart of the Pe
ople's Republic of China in Hunan Province. Mouchel commenced detailed
engineering design work in February 1988 and issued first working dra
wings in under three months to enable commencement of site formation a
nd demolition of existing underground structures, A major proportion o
f the civil construction materials were provided from sources outside
China and particularly careful planning of the logistics of procuremen
t and delivery was required. The site is situated on the Yangtze River
600 km inland, 1000 km south of Beijing and a similar distance north
of Hong Kong. This paper describes the civil engineering of the projec
t and discusses particular aspects of the project management, includin
g use of local materials and application of local construction methods
. It identifies particular difficulties overcome in the design and con
struction associated with the site location and local conditions. Use
of appropriate technology is discussed and reference is made to the ac
hievement of the Chinese construction force, their adherence to progra
mme and also the excellent working relationships established on the pr
oject. The role of Mouchel as construction adviser is reported and the
benefits of having Chinese engineers within the UK design team are di
scussed.