In this paper the optimal energy integration problem for an existing a
ntibiotics plant is discussed. An appropriate scheme for a direct heat
integration is proposed. The optimal operation and scheduling problem
s for the integrated scheme are solved. The overall energy cost is thu
s decreased by 39%.