The wind power as a large alternative energy source appear in Uruguay.
A nested method to obtain the mean wind velocity time series at compl
ex terrain sites and describe the turbulence was developed. Sites with
mean velocity over 9m/s and capcity factor over 40% were found. The a
erodynamic interferences loss between wind generators using a numerica
l model were evaluated- and a numerical model wa; developed to design
an optimal cluster wind farm. As bulk result, an installed capacity of
300MW with a cost production less than 0.065U$S/kW.h can be estimated
over the all studied Region.