CHALLENGE TO THE HIGHEST PC RATE OPERATING AT FUKUYAMA NO-4 BF

Citation
K. Kimura et al., CHALLENGE TO THE HIGHEST PC RATE OPERATING AT FUKUYAMA NO-4 BF, Revue de métallurgie, 93(4), 1996, pp. 575-580
Citations number
NO
Categorie Soggetti
Metallurgy & Metallurigical Engineering
Journal title
Revue de métallurgie
ISSN journal
00351563 → ACNP
Volume
93
Issue
4
Year of publication
1996
Pages
575 - 580
Database
ISI
SICI code
Abstract
Fukuyama No. 4 blast furnace has been operated at 230 kg/t PCR and car ried a stable monthly operation of 218 kg/t. This was achieved thanks to the use of eccentric double lances with high combustion efficiency and the use of Hybrid Pelletized Sinter with superior reducibility and melting characteristics. This setting brought a reduction in fine cok e ratio in the deadman and improved permeability. The next evolution i s to achieve a PCR of 250-300 kg/t.