COUPLING CURRENTS LOSSES BENCH-MARK TEST OF ITER SUBSIZE CONDUCTOR

Citation
P. Bruzzone et al., COUPLING CURRENTS LOSSES BENCH-MARK TEST OF ITER SUBSIZE CONDUCTOR, IEEE transactions on magnetics, 32(4), 1996, pp. 2826-2829
Citations number
6
Categorie Soggetti
Engineering, Eletrical & Electronic","Physics, Applied
ISSN journal
00189464
Volume
32
Issue
4
Year of publication
1996
Part
1
Pages
2826 - 2829
Database
ISI
SICI code
0018-9464(1996)32:4<2826:CCLBTO>2.0.ZU;2-E
Abstract
To solve the discrepancies frequently observed between coupling curren ts losses results measured on similar samples at different labs, a ben ch mark rest action has been carried out among five laboratories of th e four partners of the ITER project. The specimen for the bench mark a ction is a short sections of Nb3Sn cable-in-conduit conductor with the same layout as the last but one stage of the ITER conductor. The five labs measure the AC losses by boil-off calorimetry. The test programm e, selected according to the capabilities of the test equipment, allow s a direct comparison of the test results over a broad range of field pulses.