To solve the discrepancies frequently observed between coupling curren
ts losses results measured on similar samples at different labs, a ben
ch mark rest action has been carried out among five laboratories of th
e four partners of the ITER project. The specimen for the bench mark a
ction is a short sections of Nb3Sn cable-in-conduit conductor with the
same layout as the last but one stage of the ITER conductor. The five
labs measure the AC losses by boil-off calorimetry. The test programm
e, selected according to the capabilities of the test equipment, allow
s a direct comparison of the test results over a broad range of field
pulses.