This paper is concerned with the wave power installation located on th
e Island of Islay, which lies off the western coast of Scotland. A sys
tem simulation has been conducted and validated by a comparison betwee
n predicted results and measured data, In order both to reduce power r
ipple content and improve efficiency, an optimisation study has been p
erformed and optimum parameters ape suggested, The results demonstrate
that an overall optimum for system performance results from a combina
tion of system components which are not individually optimised.