A PLANNING AND SCHEDULING SYSTEM FOR MANUFACTURING ENVIRONMENT

Authors
Citation
Mg. Pereira, A PLANNING AND SCHEDULING SYSTEM FOR MANUFACTURING ENVIRONMENT, Computers & industrial engineering, 31(1-2), 1996, pp. 189-192
Citations number
2
Categorie Soggetti
Computer Application, Chemistry & Engineering","Computer Science Interdisciplinary Applications","Engineering, Industrial
ISSN journal
03608352
Volume
31
Issue
1-2
Year of publication
1996
Pages
189 - 192
Database
ISI
SICI code
0360-8352(1996)31:1-2<189:APASSF>2.0.ZU;2-P
Abstract
This article presents a resume of extensive research carried out in th e area of construction of pre-molded parts. The problem was studied un der several different aspects, such as construction, computation, plan ning, and good results were obtained. Construction with pre-molded ele ments means a promising future for Brazil. At present, little of this kind of construction has been done in the country, considering the tot al number of constructions. Nevertheless, it is a practical constructi on, used all over the world, and offers a number of advantages over co nventional construction. In the social area it is quite important, for this kind of construction was utilized to reconstruct European cities after the wars of this century. At that time, great projects were car ried out by architects of renown, such as Cropius and Le Corbusier, wh o left a mark in the history of civil construction.