DEVELOPMENT OF 2-REACTOR INTERMITTENT-AERATION ACTIVATED-SLUDGE PROCESS FOR SIMULTANEOUS REMOVAL OF NITROGEN AND PHOSPHORUS
Citation
K. Sasaki et al., DEVELOPMENT OF 2-REACTOR INTERMITTENT-AERATION ACTIVATED-SLUDGE PROCESS FOR SIMULTANEOUS REMOVAL OF NITROGEN AND PHOSPHORUS, Water science and technology, 34(1-2), 1996, pp. 111-118
Categorie Soggetti
Water Resources","Environmental Sciences","Engineering, Civil
SICI code
0273-1223(1996)34:1-2<111:DO2IAP>2.0.ZU;2-Q
Abstract
We have developed a new intermittently aerated anaerobic-aerobic activ
ated sludge process. This process employs 2 reactors connected in seri
es, and is capable of controlling the duration of aerobic, anoxic and
anaerobic conditions in both reactors by utilizing the ORP bending poi
nt, which corresponds to the termination of denitrification. One cycle
of aeration and agitation takes approximately 120 minutes. In the Ist
reactor, nitrification and phosphorus uptake occur in the aeration pe
riod, followed by denitrification and phosphorus release in the agitat
ion period. In the 2nd reactor, nitrification and phosphorus uptake ar
e conducted during aeration, and denitrification and weak phosphorus u
ptake during agitation. A one-year pilot plant experiment using sewage
(22 m(3)/day) showed stable and high removal ratios of 98% for BOD, 9
2% for T-N, and 85% for T-P under conditions of HRT 20 hours and water
temperature 9-33 degrees C. Copyright (C) 1996 IAWQ.