H. Tsubone et H. Furuta, REPLANNING TIMING IN HIERARCHICAL PRODUCTION PLANNING, International journal of production economics, 44(1-2), 1996, pp. 53-61
In this paper we discuss the relationship between the timing for repla
nning and the buffer inventory in terms of system performance in a mul
tistage production system, where there are multiple opportunities for
replanning within the accumulated production lead time. Two performanc
e measures are used: the unfilled rate for market demand (alpha) and t
he rate of change in production quantity due to replanning (beta). The
results obtained through simulation study yield a basis for choosing
a replanning rule.