This paper gives an overview of the TIGER system in use at Exxon Chemi
cal at Fife Ethylene Plant in Scotland. It gives a summary of the plan
t and the usage of the GE Frame 5 two shaft turbine. Also, it gives an
overview of the functionality of the TIGER system and a description o
f how it is being used at Exxon.