CIM IMPLEMENTATION THROUGH JIT AND MRP INTEGRATION

Authors
Citation
Yq. Lee et Hj. Shin, CIM IMPLEMENTATION THROUGH JIT AND MRP INTEGRATION, Computers & industrial engineering, 31(3-4), 1996, pp. 609-612
Citations number
4
Categorie Soggetti
Computer Application, Chemistry & Engineering","Computer Science Interdisciplinary Applications","Engineering, Industrial
ISSN journal
03608352
Volume
31
Issue
3-4
Year of publication
1996
Pages
609 - 612
Database
ISI
SICI code
0360-8352(1996)31:3-4<609:CITJAM>2.0.ZU;2-R
Abstract
A CIM implementation case is introduced in this paper. It is accomplis hed through the integration of two fundamental approaches to productio n planning and control; JIT and MRP. The resultant system is a hybrid where some JIT methodologies prevail, but the benefits of the MRP are also required. A new BOM structure is designed for the load leveled pr oduction with small lot size and the synchronized production. The over all production planning concept is described with actual data.