The upgrading of several 69 kV pipe-type cable feeders on the Potomac
Electric Power Company (PEPCo) transmission cable system is discussed
The methods used for the ampacity calculation are described. The fluid
circulation approach required to meet the feeder emergency load requi
rements are discussed For the feeders that were in service for approxi
mately 40 years, a system life evaluation was performed.