SCHEDULING MULTIPURPOSE BATCH PLANTS WITH JUNCTION CONSTRAINTS

Citation
Ym. Dessouky et al., SCHEDULING MULTIPURPOSE BATCH PLANTS WITH JUNCTION CONSTRAINTS, International Journal of Production Research, 34(2), 1996, pp. 525-541
Citations number
22
Categorie Soggetti
Engineering,"Operatione Research & Management Science
ISSN journal
00207543
Volume
34
Issue
2
Year of publication
1996
Pages
525 - 541
Database
ISI
SICI code
0020-7543(1996)34:2<525:SMBPWJ>2.0.ZU;2-0
Abstract
There is an increasing trend in the chemical process industry to opera te flexible batch plants because of their capability to manufacture mu ltiple products simultaneously by sharing the same process resources. In this paper, the scheduling of multi-purpose batch chemical plants w ith junction (header) constraints is considered. A mixed-integer non-l inear model for the scheduling of multi-purpose batch chemical plants is formulated that considers the connection between equipment sets, tr ansfer times, variable batch sizes, alternative process plans, and bat ch merging. Because of the computational time complexity of the batch scheduling problem, a heuristic scheduling algorithm that minimizes th e total tardiness is developed to solve the model.