High accelerating fields at low rf power losses are needed for the ALP
I superconducting booster currently under construction at Legnaro. Nio
bium sputtering onto 160 MHz OFHC Copper Quarter Wave resonators (QWRs
) has been investigated in a Biased DC Diode configuration. Q-values o
f the order of 10(9) and accelerating fields over 6 MV/m at 7 Watt - t
hat are far above ALPI specifications - are currently achievable with
high reproducibility. Due to the high RF performances achieved and the
ir reliability, sputtered QWRs will be installed into the ALPI high be
ta section.