This paper introduces a four-rule heuristic method for production/asse
mbly line balancing which seeks to minimize the number of workstations
for a given cycle time. To evaluate its performance, the proposed met
hod was compared with 15 other heuristic methods ranging in complexity
from random assignment of work elements to Hoffmann's enumeration pro
cedure. The results, based on both randomly generated problems and pro
blems taken from the literature, indicate that the proposed heuristic
outperformed other procedures. Further, the suggested method was able
to find the optimal solution for 57 (85%) of the 67 literature problem
s.