A computer simulation model in ASPEN PLUS shell has been developed to
simulate the performance of IGCC and IGHAT cycle power plants. The mod
el was used to study the effects of design and performance parameters
on the efficiency and emissions from IGCC and IGHAT cycles. The simula
tion models are capable of performing mass, energy and exergy balances
which may be used to trace system inefficiencies to their source comp
onent thereby providing insights into component interactions within th
e cycles and act as pointers to system optimization trade-offs.