SPECIFICATION, INSTALLATION AND COMMISSIONING OF A LARGE INDUSTRIAL CONTROL-SYSTEM FOR THE LEP2 CRYOGENICS

Citation
Hk. Kuhn et al., SPECIFICATION, INSTALLATION AND COMMISSIONING OF A LARGE INDUSTRIAL CONTROL-SYSTEM FOR THE LEP2 CRYOGENICS, Nuclear instruments & methods in physics research. Section A, Accelerators, spectrometers, detectors and associated equipment, 352(1-2), 1994, pp. 467-470
Citations number
3
Categorie Soggetti
Nuclear Sciences & Tecnology","Physics, Particles & Fields","Instument & Instrumentation",Spectroscopy
ISSN journal
01689002
Volume
352
Issue
1-2
Year of publication
1994
Pages
467 - 470
Database
ISI
SICI code
0168-9002(1994)352:1-2<467:SIACOA>2.0.ZU;2-A
Abstract
CERN is upgrading the LEP e(+)-e(-) collider for energies above the Z( 0) particle by installing super-conducting cavities. The cryogenic sys tem attached to these cavities is controlled by a distributed, industr ial control system, having been the object of a tender. The issues rel ate to the software specification, the management of the contract, the installation and the gradual commissioning of the system. The experie nce with a fully farmed-out solution is reported.