The Occupational Radiation Exposure (ORE) for the water primary coolin
g system (PCS) of the SEAFP (Safety and Environmental Assessment of Fu
sion Power) alternative plant model (APM) was assessed taking into acc
ount the first wall/blanket section only. All the potential radiologic
al sources were considered and the analysis was restricted to the most
important source at the PCS, the activated corrosion products (ACP).
The neutrons have the capability to activate the materials under their
flux and therefore also the Inner surface of the in-vessel portion of
the PCS undergo to such a process. Production, erosion/corrosion, tra
nsport and deposition of the ACP are the subject of a parallel work pr
esented al the same meeting. The ACP deposited on the inner surface of
the PCS components are responsible for the personnel external irradia
tion. The relevant dose rate was evaluated by using the computer code
MCNP and comparing the results with the respective values measured at
the fission PWR plants. The comparison with the FWR made it possible t
o transfer the parameters relevant to the working activities to the SE
AFP PCS. Maintenance and inspection were found to be the only working
tasks applicable to the SEAFP circuit and the worker access was consid
ered to be allowed 24 h after the plant shut down only. The ORE figure
s are shown in the work for each working activity and are compared wit
h those measured at the PWR similar circuit. The comparison showed a m
ore acceptable result from the radiological safety point of view for t
he SEAFP staff.