The European negative ion based neutral beam development programme con
sists presently of experiments on high energy electrostatic accelerato
rs and high current D- sources, and of neutral beam physics and system
design studies. At CEA-Cadarache the source test bed MANTIS started o
peration last June, and the 1 MV, 0.1 A, D- acceleration project SINGA
P will be operational by the end of 1994. Additionally, negative ion s
ource physics-oriented experiments will be conducted at Dublin City Un
iversity. A Pagoda source, developed for the SINGAP experiment, recent
ly produced more than 1 A D- beams and j(D-) of 10 mA cm(-2), with Cs
seeding, at 0.6 Pa operating pressure. 1.3 A H- and 0.5 A D- beams hav
e also been obtained without the use of Cs during the first experiment
s on MANTIS. Studies on neutral beam heating (NBH) for a next step mac
hine have been conducted during 1993, mainly at JET and CEA-Cadarache.
NBH physics studies based on the RLW model indicate that ignition on
ITER-EDA should be reached with about 40 MW of 0.4-1 MeV D-0 beams. Th
e outlines of an NBH system for ITER-EDA, based on SINGAP, have been s
tudied.