A POWER-SUPPLY SYSTEM FOR A 125 KEV 250 KEV NEUTRAL BEAM INJECTOR TEST STAND BASED ON NEGATIVE-ION SOURCES/
Citation
Y. Suzuki et al., A POWER-SUPPLY SYSTEM FOR A 125 KEV 250 KEV NEUTRAL BEAM INJECTOR TEST STAND BASED ON NEGATIVE-ION SOURCES/, Fusion engineering and design, 26(1-4), 1995, pp. 535-538
Categorie Soggetti
Nuclear Sciences & Tecnology
SICI code
0920-3796(1995)26:1-4<535:APSFA1>2.0.ZU;2-R
Abstract
A design for a power supply system for the neutral beam injection (NBI
) test stand of the large helical device (LHD) is presented. The accel
eration power supply of -250 kV, 50 A is composed of three power suppl
ies connected in series to deliver two intermediate outputs. It has a
-40 kV power supply, a - 90 kV power supply and a -120 kV power supply
. A beamline and the major part of the power supply system for the NBI
test stand were constructed in 1992. The -120 kV power supply was mov
ed from Higashiyama to Toki in 1994. Another power supply of -40 kV wi
ll be added for -250 kV acceleration in the future. A brief outline of
the control system of the NBI test stand is also presented.