The concern about electromagnetic field (EMF) effects on human health
has heightened public awareness of overhead transmission lines plannin
g and operation. The objective of this paper is to study the effect of
EMF constraints on optimal power generation scheduling. This study co
nsiders reducing EMF levels associated with critical transmission line
s by redistributing the scheduled power generation, while maintaining
the minimum operation cost as an objective. The EMF constraints are gi
ven in terms of control variables and fuzzy sets are utilized to model
the tradeoff between minimizing the objective function and satisfying
EMF constraints. Numerical results for the application of the propose
d approach to test systems are discussed.