P. Yenradee, APPLICATION OF OPTIMIZED PRODUCTION TECHNOLOGY IN A CAPACITY CONSTRAINED FLOW-SHOP - A CASE-STUDY IN A BATTERY FACTORY, Computers & industrial engineering, 27(1-4), 1994, pp. 217-220
An application of the OPT principles and some simple scheduling rules
without the sophisticated OPT software in a four-stage capacity constr
ained flow shop is demonstrated by using a medium-sized battery factor
y as a case study. The throughput and inventory performances of OPT po
licy are evaluated and compared with those of push and pull policies b
y using a simulation study. The performances of OPT are attractive. Al
though, the OPT policy has relatively low inventory level, it can stil
l maintain relatively high throughput rate.