The expected production cost of a multiarea power system is estimated
by constructing a sequence of upper and lower bounds. The approach use
s a state space characterization of equipment availability and loads,
combined with network optimization methods and standard load duration
curve-based production costing techniques. Convergence of the algorith
ms is proved. An illustrative application is presented.