Llm. Santos et al., PRODUCTION OF F-18 USING A NATURAL-WATER TARGET AT THE CV-28 CYCLOTRON AT IPEN-CNEN SP/, Journal of radioanalytical and nuclear chemistry, 200(3), 1995, pp. 227-232
The development of an automated water target for the production of F-1
8 is described. The system was fully tested and shown to be reliable a
nd secure. The chemical separation of F-18 was carried out using an an
ion-exchange resin and K2CO3 as eluent. The F-18 production yields wer
e, on average, (4.81+/-0.42) MBq/mu Ah and the specific activity was h
igher than 6.623 x 10(5) MBq/mmol. Heat transfer measurements and calc
ulations were made.