A. Hidaka et al., SCDAP RELAP5 ANALYSIS OF STATION BLACKOUT WITH PUMP SEAL LOCA IN SURRY PLANT, Journal of Nuclear Science and Technology, 32(6), 1995, pp. 527-538
During a station blackout of PWR, the pump seal will fail due to loss
of the seal cooling. This particular transient-LOCA sequence designate
d as S3-TMLB' analyzed by SNL with MELPROG/TRAC for Surry plant showed
that the depressurization due to the pump seal LOCA would result in e
arly accumulator injection and subsequent core cooling which lead to t
he delay of reactor pressure vessel (RPV) meltthrough. The present ana
lysis was performed with SCDAP/RELAP5 to evaluate this scenario shown
in the MELPROG/TRAC analyses. Additionally, the calculated results wer
e compared with the similar experimental studies of JAERI's ROSA-IV pr
ogram. The present analyses showed that: (1) During S3-TMLB', the loop
seal clearing would occur and cause a slight delay of accident progre
ssion. (2) It is unlikely that the accumulator injection, which leads
to the delay of RPV meltthrough by approximately 60 min, is initiated
automatically during S3-TMLB'. Accordingly, an intentional depressuriz
ation using PORVs is recommended for the mitigation of the accident co
nsequences. (3) The present SCDAP/RELAP5 analyses did not show signifi
cant delay of accident progression. It was found that non-realistic lo
wer heat generation and higher core cooling models used in the MELPROG
/TRAC analysis are attributed to this discrepancy.