In this paper a new meter placement method is presented. The method is
comprehensive in that all the important aspects of the problem - cost
, accuracy, reliability, and bad data processing capability requiremen
ts - are incorporated into the method. The problem is solved in three
stages. The objective in the first stage is to place a minimum set of
measurements which satisfies the desired accuracy requirements. In the
second stage, additional meters are placed to incorporate reliability
requirements which are defined in term of loss of RTUs. In the third
stage, additional meters are placed to improve the bad data processing
ability of the state estimation in terms of detecting and identifying
the bad data.