This paper analyses the fatigue failure of a number of welded steel dr
ums which were key components in a large new conveyor system for handl
ing minerals. Each drum consisted of a cylindrical shell carried on a
solid circular shaft. The shaft projected beyond both ends of the shel
l, and was supported in self-aligning bearings. The shell was attached
to the shaft by fixing a pair of annular plates between the shaft and
the ends of the shell. The outer circumference of each plate was weld
ed to the shell, and the inner circumference was welded to a boss whic
h was keyed to the shaft. The drums rotated in service at 0.5-1 s(-1).
Failures occurred after 1-4 weeks of commissioning trials, correspond
ing to 0.6-4.6 million revolutions of the drums. Fatigue cracks initia
ted at the toes of the welds between the plates and the bosses, and pr
opagated through the plates until the shell became detached from the s
haft. An elastic analysis showed that high cyclic bending stresses wer
e produced at the plate-boss welds when the drums were loaded by the t
ension in the conveyor belt. The stress ranges in the failed drums wer
e comparable to the fatigue strengths of welds in structural steel, as
given in BS 5400:Part 10:1980. As a consequence a total of approximat
e to 140 drums were condemned throughout the whole of the plant, with
major cost implications.