Pg. Griffin et al., MONOBORE COMPLETIONS AND NOVEL WIRELINE PERFORATING OF HIGH-ANGLE WELLS IN THE NELSON FIELD, Journal of petroleum technology, 47(10), 1995, pp. 879-883
Citations number
3
Categorie Soggetti
Energy & Fuels","Engineering, Chemical",Geology,"Engineering, Petroleum
The Nelson field gas-lift completions were designed to optimize produc
tion, enhance safety and reliability, and minimize well-maintenance co
sts. The completions are of a near-monobore design and include an annu
lar safety system, which is regarded as a major safety benefit during
gas lift. The single-trip completions were batch installed in eight hi
gh-angle (up to 70 degrees) predrilled wells. This paper presents deta
ils of the completion design and the approach taken to planning and in
stalling the completions. The paper also describes the use of a novel
technique for perforating the platform wells with wireline guns.