MONOBORE COMPLETIONS AND NOVEL WIRELINE PERFORATING OF HIGH-ANGLE WELLS IN THE NELSON FIELD

Citation
Pg. Griffin et al., MONOBORE COMPLETIONS AND NOVEL WIRELINE PERFORATING OF HIGH-ANGLE WELLS IN THE NELSON FIELD, Journal of petroleum technology, 47(10), 1995, pp. 879-883
Citations number
3
Categorie Soggetti
Energy & Fuels","Engineering, Chemical",Geology,"Engineering, Petroleum
ISSN journal
01492136
Volume
47
Issue
10
Year of publication
1995
Pages
879 - 883
Database
ISI
SICI code
0149-2136(1995)47:10<879:MCANWP>2.0.ZU;2-X
Abstract
The Nelson field gas-lift completions were designed to optimize produc tion, enhance safety and reliability, and minimize well-maintenance co sts. The completions are of a near-monobore design and include an annu lar safety system, which is regarded as a major safety benefit during gas lift. The single-trip completions were batch installed in eight hi gh-angle (up to 70 degrees) predrilled wells. This paper presents deta ils of the completion design and the approach taken to planning and in stalling the completions. The paper also describes the use of a novel technique for perforating the platform wells with wireline guns.