A four-year study of pipe-to-soil pipe-to-soil potentials data obtaine
d using the pulse generator and waveform analyzer is presented. Data t
ons collected from four areas in Alberta. Comparison of the data to in
dustry-standard acceptance criteria and concerns associated with adopt
ing an acceptance criteria for Nova Gas Transmission Ltd. are discusse
d.