OPTIMIZATION AND HEURISTIC MODELS TO INTEGRATE PROJECT TASK AND MANPOWER SCHEDULING

Citation
J. Bailey et al., OPTIMIZATION AND HEURISTIC MODELS TO INTEGRATE PROJECT TASK AND MANPOWER SCHEDULING, Computers & industrial engineering, 29, 1995, pp. 473-476
Citations number
5
Categorie Soggetti
Computer Application, Chemistry & Engineering","Computer Science Interdisciplinary Applications","Engineering, Industrial
ISSN journal
03608352
Volume
29
Year of publication
1995
Pages
473 - 476
Database
ISI
SICI code
0360-8352(1995)29:<473:OAHMTI>2.0.ZU;2-S
Abstract
The objective of project scheduling is to determine start dates and th e labor resources assigned to each activity in order to complete a pro ject an time. BY moving start dates within available slack times and a ltering labor levels, the daily labor-demand profile can be changed. T he objective of personnel scheduling is to determine how many of each feasible workday tour are required to satisfy a given labor-demand pro file while minimizing:the cost of labor plus overhead. Integrating the se two problems permits the simultaneous determination of start dates, labor levels and tours for a minimum-cost and on-time schedule. In th is paper, single and multiple resource optimization models and heurist ic solution procedures to solve the integrated problem are presented. heuristic procedure outperformed the non-integrated two-step schedulin g procedure by reducing the cost of labor and overhead and performed n early as well as the optimization procedure.