SCHEDULING OF DIRECT LOAD CONTROL TO MINIMIZE LOAD REDUCTION FOR A UTILITY SUFFERING FROM GENERATION SHORTAGE

Authors
Citation
Wc. Chu et al., SCHEDULING OF DIRECT LOAD CONTROL TO MINIMIZE LOAD REDUCTION FOR A UTILITY SUFFERING FROM GENERATION SHORTAGE, IEEE transactions on power systems, 8(4), 1993, pp. 1525-1530
Citations number
10
Categorie Soggetti
Engineering, Eletrical & Electronic
ISSN journal
08858950
Volume
8
Issue
4
Year of publication
1993
Pages
1525 - 1530
Database
ISI
SICI code
0885-8950(1993)8:4<1525:SODLCT>2.0.ZU;2-Y
Abstract
This paper adopts the method of dynamic programming to optimally deter mine the schedule of the Direct Load Control, but its objective functi on is to minimize the amount of load reduction with appropriate constr aints. This approach is intended to solve the chronic problem of sever e power shortage in the summer for the Taiwan Power Company (Taipower or TPC). This scheduling scheme is to reduce the resulting inconvenien ce to customers as well as the effects to the total income from electr icity sales to the minimum under the particular management conditions the TPC finds itself in.