OPTIMAL TARGET VALUES FOR A FILLING PROCESS WHEN INSPECTION IS BASED ON A CORRELATED VARIABLE

Authors
Citation
Ds. Bai et Mk. Lee, OPTIMAL TARGET VALUES FOR A FILLING PROCESS WHEN INSPECTION IS BASED ON A CORRELATED VARIABLE, International journal of production economics, 32(3), 1993, pp. 327-334
Citations number
NO
Categorie Soggetti
Engineering
ISSN journal
09255273
Volume
32
Issue
3
Year of publication
1993
Pages
327 - 334
Database
ISI
SICI code
0925-5273(1993)32:3<327:OTVFAF>2.0.ZU;2-W
Abstract
The problem of selecting optimal target values for the mean of the qua ntity Y of material in a container and the cutoff value on a correlate d variable X is considered for a filling process in which a container is nonconforming if its Y value is less than the lower specification l imit and inspection is based on X instead of Y. A profit model is cons tructed which involves selling price and filling, rework, inspection, and penalty costs. Assuming that X and Y are jointly normally distribu ted, a method of finding the optimal process mean and the cutoff value on X is presented. An example from the cement industry is presented.