The paper documents results of oil displacement modelling, using both
the Intera's Eclipse software package (a 3D three-phase model) and the
one produced domestically by SibNIINP and TomskNIPIneft). The hydrody
namic modelling of Pervomaiskoye field yields the optimum schedule for
putting shut-in wells in production.