In November 1994, the construction of a new superconducting muon chann
el of the RIKEN-RAL muon facility at ISIS of Rutherford Appleton Labor
atory was completed. Subsequently, important features, such as the hig
hest instantaneous intensity with a single-pulse structure and a high
purity have been confirmed. Along with the installation of advanced mu
CF experimental equipment, including a high-purity D-T mixture target
system with an in situ He-3 removal capability and a 4 T confinement
magnet, an advanced mu CF experiment, e.g. a precise X-ray measurement
on mu-alpha sticking in dt mu-mu CF will. be realized. An account of
the commissioning experiments, a plan for the earliest phase of the mu
CF experiment and possible future directions are reported.