The thrust of this research is the comparison of the constant work in
process (CONWIP) order release strategy versus a typical MRP order rel
ease strategy and the validation of a CONWIP model in an actual plant
environment. The Westinghouse Electric-College Station, Texas Plant se
rved as a test facility. This plant is a typical small batch electroni
cs products manufacturer, currently using MRP for production planning.
All plant operations from order kitting, order release, assembly, tes
ting, inspection. and shipping were modeled. Simulation results indica
te that the CONWIP order release strategy could be utilized as a valid
aid in reducing plant WIP, while insuring current levels of throughpu
t