Hg. Chen, PULL-PUSH HEURISTIC FOR ROBOT CYCLIC WALK-PATH DEVELOPMENT IN FLEXIBLE MANUFACTURING CELLS, Journal of manufacturing systems, 13(1), 1994, pp. 31-36
Citations number
NO
Categorie Soggetti
Engineering, Manufacturing","Operatione Research & Management Science","Engineering, Industrial
This research examines the robot scheduling problem of flexible manufa
cturing cells. The robot loads jobs into machines, unloads jobs from m
achines, and transports jobs between machines. A structure is devised
to analyze the robot's activities. Two greedy scheduling rules-pull an
d push-are defined and analyzed. A pull-push heuristic is then devised
and evaluated.