Achievable generator reactive capability (GRC) is generally much less
than indicated by manufacturers' reactive capability curves, due to co
nstraints imposed by plant auxiliaries and the power system itself. Th
e nature of these constraints is explained and a method for calculatin
g them is provided and verified by field tests on a unit at high and l
ow system voltage levels. Several recommendations are made to enhance
the GRC of the tested unit.