Many control configuration schemes are used to accomplish a boiler fol
lowing control task. Yet the choice of the best scheme for this task i
s still an open problem. A way to solve this problem with the aid of o
ptimization is presented. The optimization results were carried out on
a drum type boiler and improved significantly the MW response of the
boiler.