OPERATION OF KAKOGAWA NO 1 BLAST-FURNACE WITH HIGH PULVERIZED COAL INJECTION RATE

Citation
Y. Yamagata et al., OPERATION OF KAKOGAWA NO 1 BLAST-FURNACE WITH HIGH PULVERIZED COAL INJECTION RATE, Revue de métallurgie, 91(3), 1994, pp. 431-437
Citations number
5
Categorie Soggetti
Metallurgy & Mining
Journal title
Revue de métallurgie
ISSN journal
00351563 → ACNP
Volume
91
Issue
3
Year of publication
1994
Pages
431 - 437
Database
ISI
SICI code
Abstract
The PC rate at Kakogawa No.1 blast furnace was increased from 110 kg/t hm starting in October 1992. As a result, in December 1992, the PC rat e had reached 187 kg/thm on a monthly average. Some phenomena were obs erved in the furnace with a high PC rate using sensors, such as racewa y probe and burden profilometer with microwave. Information on raceway condition, burden distribution, etc., was obtained.