THE NEW BROMPTON-ESTATE STORMWATER MANAGEMENT TRIAL - FIRST RESULTS

Citation
B. Hopkins et Jr. Sargue, THE NEW BROMPTON-ESTATE STORMWATER MANAGEMENT TRIAL - FIRST RESULTS, Water science and technology, 29(1-2), 1994, pp. 311-318
Citations number
7
Categorie Soggetti
Water Resources","Environmental Sciences","Engineering, Civil
ISSN journal
02731223
Volume
29
Issue
1-2
Year of publication
1994
Pages
311 - 318
Database
ISI
SICI code
0273-1223(1994)29:1-2<311:TNBSMT>2.0.ZU;2-Q
Abstract
Runoff from the roofs of 15 houses in a medium-density residential dev elopment in suburban Adelaide. capital city of South Australia, is bei ng collected and temporarily stored in a gravel-filled stormwater rete ntion trench installed in a centrally located reserve. The site is und erlain by an upper level Quaternary aquifer. ambient salinity 2000 mg/ l, which receives stormwater supplied from the trench via a bore durin g large winter storm events. Water pumped from the aquifer in summer s hows a quality suitable for open space irrigation. Observations made d uring the second half of 1992 have highlighted aspects of the design w hich require modification in order to improve the performance of the r etention/recharge/retrieval system. Data collected between August and October have indicated that the volume of storm\vater stored in the aq uifer on an annual basis will be sufficient to meet the irrigation nee ds of the reserve.