SCHEDULING METHOD IN DESIGN OF MULTIPURPOSE BATCH PLANTS WITH CONSTRAINED RESOURCES

Citation
T. Fuchino et al., SCHEDULING METHOD IN DESIGN OF MULTIPURPOSE BATCH PLANTS WITH CONSTRAINED RESOURCES, Journal of Chemical Engineering of Japan, 27(3), 1994, pp. 363-368
Citations number
8
Categorie Soggetti
Engineering, Chemical
ISSN journal
00219592
Volume
27
Issue
3
Year of publication
1994
Pages
363 - 368
Database
ISI
SICI code
0021-9592(1994)27:3<363:SMIDOM>2.0.ZU;2-2
Abstract
A scheduling method that incorporates the design of multipurpose batch plants is developed. The scheduling consists of two interactive sub-p roblems: production scheduling and constrained resources scheduling, a nd on-site work is one of the typical constrained resources. In the de sign of these plants, the optimal schedule should be made within a sho rt time, and cyclic scheduling according to the cycle production is ap propriate. An IP (Integer Programing) model is suitable for such short -term scheduling, and the scheduling method is developed on the basis of the previous IP model for production scheduling. To make the optima l schedule, the allocation and sequence of tasks of on-site work shoul d be optimized in relation with the production scheduling. In this stu dy, the required properties of the on-site work scheduling in design i s considered, and this sub-problem is converted into an assignment pro blem. The on-site work is defined in linear constraints with integer v ariables describing the task assignments. Moreover, the on-site work i s newly defined in the production scheduling, and these definitions ar e related by the introduced integer variables. Finally, the effectiven ess of the developed scheduling method is demonstrated by an example p roblem.