THE AMS FACILITY AT GIF-SUR-YVETTE - PROGRESS, PERTURBATIONS AND PROJECTS

Citation
Gm. Raisbeck et al., THE AMS FACILITY AT GIF-SUR-YVETTE - PROGRESS, PERTURBATIONS AND PROJECTS, Nuclear instruments & methods in physics research. Section B, Beam interactions with materials and atoms, 92(1-4), 1994, pp. 43-46
Citations number
20
Categorie Soggetti
Physics, Nuclear","Nuclear Sciences & Tecnology","Instument & Instrumentation
ISSN journal
0168583X
Volume
92
Issue
1-4
Year of publication
1994
Pages
43 - 46
Database
ISI
SICI code
0168-583X(1994)92:1-4<43:TAFAG->2.0.ZU;2-Y
Abstract
We report on developments at the Gif-sur-Yvette AMS facility since 199 0. On the technical side these include: (i) installation of a new dual port injection line based on a rotating electrostatic analyzer design ed and constructed by IsoTrace laboratory; (ii) new estimates of Be-10 efficiency and background; (iii) the failure of one of the Delrin com pression rods on the column, resulting in the rupture of the low energ y accelerator tube; (iv) plans (unfortunately not yet fulfilled) to ad d a second high energy line to permit analysis of ions heavier than ma ss 30. We also give a brief resume of the research programs currently being carried out using Be-10 and Al-26.