Description of the Hickman works and the CSP plant. Further developmen
t of the CSP technology in the area of the mould, submerged tube and c
asting machine. Start-up curve of the CSP plant with attainment of the
break-even point just 5 months after commissioning. Dimensional consi
stency, mechanical properties, thickness and profile accuracy of the r
olled strips on the basis of statistical investigations. Automation sy
stem. Downtime and yield. Wider application field of the hot strip pro
duced. Personnel requirements. Reduced warehouse stocks. Expansion of
the plant by installation of a second casting strand.