Four 8 cm aperture sextupoles have been built at BNL to verify the mag
netic performance of this magnet in the RHIC installation. Two signifi
cantly different mechanical configurations have been designed, and two
magnets of each design have been built, and successfully tested, and
have exceeded the required minimum quench current by a substantial mar
gin. This report describes the assembly details of the second configur
ation, which is the final production configuration. In addition the fi
rst industry built production sextupole has been delivered and tested.
This report presents the results of quench tests on all 5 magnets and
field measurements on the first production sextupole.