To alleviate water shortage on Penghu Island, a feasibility study was
carried out on management of water resources (underground waters and a
quifers), on the use of well water in combination with RO and on seawa
ter desalination. It was recommended that a 2,000 ton/d seawater RO or
VC desalination plant be considered and electrical power be taken fro
m the grid, Energy and water resource planning should be done together
and a dual purpose power/desalting plant be considered for reduction
of water costs.