Job-shop scheduling through simulation uses various kinds of dispatchi
ng rules such as SPT or the slack time rule. Each of these rules aims
at satisfying a single criterion although workshop management is a mul
ti-criteria problem. This paper proposes a way to use fuzzy logic in o
rder to build aggregated rules allowing to obtain a compromise between
the satisfaction of several criteria. When the criteria of performanc
e change with the evolution of the production environment, these aggre
gated rules can be parametrized in order to modify the respective infl
uence of the elementary rules they are composed of.