A SIMULATION ANALYSIS OF THE EFFECTIVENESS OF DRUM-BUFFER-ROPE SCHEDULING IN FURNITURE MANUFACTURING

Citation
Sy. Wu et al., A SIMULATION ANALYSIS OF THE EFFECTIVENESS OF DRUM-BUFFER-ROPE SCHEDULING IN FURNITURE MANUFACTURING, Computers & industrial engineering, 26(4), 1994, pp. 757-764
Citations number
10
Categorie Soggetti
Computer Application, Chemistry & Engineering","Computer Science Interdisciplinary Applications","Engineering, Industrial
ISSN journal
03608352
Volume
26
Issue
4
Year of publication
1994
Pages
757 - 764
Database
ISI
SICI code
0360-8352(1994)26:4<757:ASAOTE>2.0.ZU;2-Z
Abstract
Simulation has proven to be an important computer tool in analyzing ne w manufacturing approaches. In this paper we use simulation models to compare a new approach to manufacturing with current practices. The ne w approach is referred to as the Drum-Buffer-Rope (DBR) method of sync hronous manufacturing. We discuss the DBR approach and demonstrate the application of DBR in a furniture manufacturing case example. Simulat ion models are used to compare the DBR approach with the typical syste m of production control referred to as a cutting approach. The simulat ion analysis indicates considerable savings in makespan are possible w hen DBR is used in place of the cutting approach.